Calthorpe Sports Centre

Calthorpe Sports Centre

 

Key facts:

Client: Calthorpe School

Consultant: VZDV

Main contractor: Willmott Dixon

Value: £450k

Start date: February 2018

Completion date: July 2018

Lowe and Oliver undertook the complete Mechanical & Electrical installation. This involved the installation of a new plant room Gas fired boilers served the heating and hot water to the building, Heat Recovery Units supplied a ventilation system to the changing room, Natural ventilation served the main Sports hall.

The electrical element included the installation of the power and lighting system throughout the sports hall. The sports hall lighting was to comply with sport England requirements and included a full dimming system complete with scene setting controls and daylight dimming. Lowe & Oliver also complete the full fire alarm system with links back to the main school and class change system.

The CCTV system installed was wired back to the School IT hub and integrated in the existing system.